![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|---|---|---|---|---|---|
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
Location
Moscow
Year
2014
TBA
49 500 m²
The project assumes construction of a 25-floor hotel complex with podium part located next to the metro station ‘Vernadskogo Avenue’ on the crossing of Vernadskogo Avenue and Koshtoyants st. Besides the hotel for 440 rooms, there is a trade gallery on the ground floor of the building. As a part of the hotel complex, a construction of a fitness center with SPA zone is also contemplated. On the 5th-6th floors, there will be a conference zone with meeting rooms equipped with tables for negotiations, projective screens and equipment for conferencing. Besides, on a building roof at level + 119.85 the platform for a helicopter rescue capsule is located.
Scope of works
Design stage: Project Documentation.
Project chapters: HVAC, WS&S, EL, BMS, LC.
Hotel on Vernadskogo Ave
Entrance "A", block 9, bld 7, Derbenevskaya Naberezhnaya, BD "Novospassky", Moscow
© 2017 Unidraft LLC | All Rights Reserved